Yabimo won another project of prefabrication and delivery of office fire stairs.
Yabimo was engaged in constructing of two identical buildings for a Norwegian client in Moskog and Orsta.
Yabimo's task required creation of executive documentation as well as production of steel hall construction elements.
Yabimo infrastructure reconstruction of national road No. E6. (Fellesprosjektet E6-Dovrebanen).
The project included prefabrication, delivery and assembly of stainless steel and glass constructions on a newly built office facility designed for companies from Oil&Gas and financial sector.
Yabimo won another tender for the implementation of steel trusses. Each truss had to be carried out in two parts, assembled on site.
The subject of the project was to produce the supporting structures for the silo and supporting structures for slip-ups.
Our task was a delivery of a small steel hall at a weight of 14 000 kg. The project assumed workshop documentation design, workshop production and logistics to loc.
Project closure in northern Sweden. Yabimo’s task was construction prefabrication, over-gabarite transport (18-metre truck sets) and elements assembly in Kalix.