Yabimo’s task involved prefabrication, installation and delivery of stainless steel railings with glass for 4 separate buildings to the area of Hessa.
Yabimo’s task involved prefabrication, delivery and assembly of steel railings with glass fulfilment and handrails in Alesund.
The works involved prefabrication and installation of stairs and entresol glass railings inside a building.
Yabimo’s task involved prefabrication, installation and delivery of steel balcony railings with glass fulfilment ...
Yabimo’s task involved prefabrication, installation and delivery of a steel balcony and stairs railings with glass fulfilment in Alesund.
The project was to perform the building of steel construction of Post Terminal with dimensions of 9.6 m x 24.0 m x 6.0 m with a gabled roof.
420 meters of steel railings with glass fulfillment for a new four-story-building
Steel hall trusses 22 metres wide each. Due to size, in order to avoid excessive delivery costs and oversized transport, trusses were divided in two parts and then welded on site.
The building of KIWI supermarket was erected thanks to our work. We made the shop’s load bearing steel construction.