« back
Project no.: YABIMO/Z/364

Tarud bridge, Norway

Prefabrication and delivery of steel elements of the Tarud bridge:

  • S355J2+N,
  • weight - approx. 26 000 kg,
  • anti-corrosion protection: hot dip galvanizing and painting with primer,
  • production according to EN 1090,
  • quality and tolerances in accordance with EXC3.