Our task was a Storhovearmen steel bridge located in E6 road in Norway. The bridge is crossing an existing railway track. Because of the diversity of steel elements 1.4404, S690QL Weldox steel and S355 black steel was used.
Solid workmanship of previous bridge projects and knowledge acquired through this practice, give a possibility ofgetting another project for construction of the next bridge. The total mass of the structure was about 13 000 kg. Corrosion protection of black steel components obtained by hot-dip galvanising with a minimum coating thickness of 100μm. All items are made exactly according to documentation in the form of drawings and descriptions and technical specifications. The project is made in accordance with the projected schedule.