Project no.: YABIMO/Z/339
Steel lift shaft construction, Norway
Yabimo performed prefabrication of the steel lift shaft construction and delivered it to the area of Frogner.
- Steel quality: S355J2
- The weight of steel approx. 14 000 kg
- Anti-corrosion protection applied
- Compliance with EXC2