Refurbishing of precast concrete factory in Borgarnes including design, delivery and installation.
Job carried out between October 2018 and January 2019.
Yabimo during this period have done a lot of major alterations to main steel and concrete structure.
Concrete walls, old silos and conveyors within the scope of work were demolished and 41 tons of new steel structure installed.
Also a new concrete transport track was designed and assembled on site.
As minor works Yabimo have installed wall and roof sandwich panels as final envelope to the factory.