Yabimo won a project for design and production of a steel hall called “Eik Trapp”. Execution of design works included: concept design of steel profiles, static calculation, building geometry, drawings of foundation anchors, forces of the structure to foundations, workshop drawings and assembly drawings. The total weight of used steel was over 57 tons which include also bolts and anchors. Constructions made from cold rolled pipes acc. to EN 10219, NDT according to EXC2, EN 1090.
Haugen 9
5412 Stord,
Norway