Project closure in northern Sweden. Yabimo’s task was construction prefabrication, over-gabarite transport (18-metre truck sets) and elements assembly in Kalix. A target intended use of racks shall be a part of sanitary elements production line.
Good cooperation with Customer and planning works allowed to finish the project 7 days before the required date. We used: S355 steel, a double anti-corrosion coating, RAL 5015. The entire weight of the construction amounts to 27 000 kg.
Below we present selected pictures taken during task realisation.