The project assumed workshop technical documentation preparation and project logistics management. Among Yabimo’s responsibilities was also a steel construction prefabrication. s355 steel was used. The total tonnage of the construction amounted to 127 000 kg.
Haugen 9
5412 Stord,
Norway