YABIMO/2014/Z/169 & YABIMO/2014/Z/181, Norway

The project subject was to execute the building of steel construction of Post Terminal with dimensions of 9.6 m x 24.0 m x 6.0 m with a gabled roof. Structures made of square tubes, I-beams HEA and angles.

The bearing components were rigid, plate girders, spaced at 4.8 m and span of 9.6 m. It was used as a corrosion protection by hot dip galvanising. The total weight of the structure is more than 11 tons of S355 steel grade. The hall is a copy of the project 169 that was performed previously.

The investor was Norwegian Post.