Project no.: YABIMO/Z/2215
Stairs at Jöfursbás 11 in Iceland
YABIMO was a supplier of steel constructions in Iceland.
Description of the project:
- Scope: static calculations, workshop and assembly drawings, delivery of all materials; assembly works on site;
- Order received in mid-December 2020, production started in July 2021 (only approx. 15 tons of steel), last assembly fixes made in December 2021;
- A very small project, very time consuming, turned out to be very important overall.