QC Frosio inspectors, engineers, foremen, supervisors
Yabimo executes project of gusset plates' production:
Yabimo executed another project for the delivery of the steel bridge elements.
Yabimo has prefabricated steel elements of the bridge
execution class: EXC3.
Yabimo executed another innovative construction of the bridge in Vinsnes. The contract covered the production of bridge elements, beams, bearings and plates.
Yabimo's team has been conducting the works of pipefitting (12 km of the pipes). The purpose of the project in Iceland is to transfer the steam and hot water from the wells.
Yabimo’s task was prefabrication and assembly of stainless steel railings with balustrades in Alesund.