YABIMO won a project for design and production of a steel hall called “Eik Trapp”. Execution of design works included: concept design of steel profiles, static calculation, building geometry, drawings of foundation anchors, forces of the structure to foundations, workshop drawings and assembly drawings.
The total weight of used steel was over 57 tons which include also bolts and anchors. Constructions made from cold rolled pipes acc. to EN 10219, NDT according to EXC2, EN 1090.
Would you like to learn more about this and other projects?
In 2026, YABIMO carried out the production and installation of interior equipment for the Sports Hall in Búðardalur, Iceland. The…
In 2025, YABIMO delivered bespoke interior solutions for the new wing of Center Hotels Grandi in Reykjavik, combining functionality with…
Discover how YABIMO can support your projects with our expertise and resources. We’re here to answer any questions you may have about our services and capabilities.
Prefer to connect with a representative in your region? Visit our Contact page for direct contact details.