Back

Production of a steel hall

2020

Time frame
Production of a steel hall

Yabimo received once again the opportunity to participate in production of the next steel hall. The scope of this task included design works. The production was according to EXC2 acc. to  EN 1090-2. Steel type: S355J2. Corrosion protection was achieved by hot dip galvanizing acc. to EN ISO 1461. The total weight of steel was more than 50 tons. We also made NDT tests - 100% VT + 10% UT + 5% MT. The project took totally 12 weeks of work (5 weeks design and 7 weeks prefabrication). Delivered on site by standard trucks (dimensions: 2,5 x 2,5 x 13,6 m.)


Would you like to learn more about this and other projects?

Would you like to learn more about this and other projects?

Other Energy projects

Let's talk

Discover how YABIMO can support your projects with our expertise and resources. We’re here to answer any questions you may have about our services and capabilities.

Prefer to connect with a representative in your region? Visit our Contact page for direct contact details.