Yabimo finished the next project for one of the longest-term partners in Norway. The subject of this task was preparation of workshop and assembly documentation and based on that production of steel construction elements for the platform. We used mix of steel: S355 and S235JR plus some elements were made in aluminum. The production was according to EN 1090, EXC2. Everything went according to the time schedule and taken 7 weeks as we assumed.