ORKUVEITA REYKJAVIKUR

2024

Time frame
We’re currently working on the remodeling of an office and service building – we’re doing a steel structure installation there in an office building in Reykjavik. The whole structure looks extremely impressive.
Interesting facts of the project straight from our engineers:
  • Steel elements totaling about 86.4t.
  • The weight of the largest single element is as much as 5t and length over 17m.
There we are engaged in creating a steel structure for landings and stairs connecting the various floors in the building. There are 6 floors, and our task is to make 5 levels. Our solution is non-trivial: We are using overhead cranes on opposing walls to assemble the support beams, since it is impossible to use a typical crane.
Today, a small crane with a width of 1.5m and an overhang of 16m arrived at the site, and we will use it for further assembly of the low-tonnage structure and for demolition of the stairs. The existing spiral staircase goes for demolition along with the steel column. The next stages of the construction are ahead of us!

 

Would you like to learn more about this and other projects?

Would you like to learn more about this and other projects?

Other Energy projects

Let's talk

Find out more about how we can use our expertise and resources to support your projects. We’re here to answer any questions you might have about our services. If you prefer to reach out to a representative in your area directly, go to the Contact page.