YABIMO/2014/Z/169 & YABIMO/2014/Z/181

2014

Time frame
YABIMO/2014/Z/169 & YABIMO/2014/Z/181

The project subject was to execute the building of steel construction of Post Terminal with dimensions of 9.6 m x 24.0 m x 6.0 m with a gabled roof. Structures made of square tubes, I-beams HEA and angles.

The bearing components were rigid, plate girders, spaced at 4.8 m and span of 9.6 m. It was used as a corrosion protection by hot dip galvanising. The total weight of the structure is more than 11 tons of S355 steel grade. The hall is a copy of the project 169 that was performed previously.

The investor was Norwegian Post.

 

 

Would you like to learn more about this and other projects?

Would you like to learn more about this and other projects?

Other Energy projects

La oss snakke!

Finn ut mer om hvordan vi kan bruke vår ekspertise og ressurser for å støtte prosjektene dine. Vi er her for å svare på eventuelle spørsmål du måtte ha om tjenestene våre. Hvis du foretrekker å ta kontakt direkte med en representant i ditt område, gå til Kontaktsiden.