KIWI stålkonstruksjon

2013

Time frame
KIWI stålkonstruksjon

The building of KIWI supermarket was erected thanks to our work. We made the shop’s load bearing steel construction. Yabimo completed another project for the preparation of technical documentation including drawings workshop and steel structure. GVW designed hall was 34 tons. S355 steel has been applied. Corrosion protection structure through a set of white paints epoxy-polyurethane coatings with a thickness of 120 microns.

Structures were delivered in two shipments due to weight and dimensions. The project was implemented in accordance with the projected schedule.

 

Would you like to learn more about this and other projects?

Would you like to learn more about this and other projects?

Other Energy projects

La oss snakke!

Finn ut mer om hvordan vi kan bruke vår ekspertise og ressurser for å støtte prosjektene dine. Vi er her for å svare på eventuelle spørsmål du måtte ha om tjenestene våre. Hvis du foretrekker å ta kontakt direkte med en representant i ditt område, gå til Kontaktsiden.