Project: YABIMO/2013/Z/062
Yabimo was awarded a new contract at realization of the infrastructure reconstruction of E6 National Road in Norway (Fellesprosjektet E6-Dovrebanen). The project assumption is to construct a wooden-steel bridge over railway tracks near Lillehammer.
Yabimo is responsible for production of the technical workshop documentation, steel prefabrication and project logistics. Bridge elements will be produced of steel: S355J2, S355N and some of acid-resistant steel.
Prefabrication will require pillars, plate beams, T-bars, joints to be produced. The whole construction will be connected with laminated wood. Anticorrosion treatment will be: dip hot galvanising, and power coating. The project is a challenge due to a large amount of details and quality prefabrication requirements.
The 50th anniversary of the AGH Faculty of Management On 11th October we had the privilege of attending the Jubilee Celebration honoring the 50th anniversary of the Faculty of Management at AGH University of Krakow. It was an extraordinary event filled with inspiring speeches and reflections on the remarkable journey of our faculty. Our […]
In mid-September, our incredible colleague Karol, Project Manager at YABIMO, took part in the extraordinary WATAHA Bieszczady Extreme Triathlon, alongside Richard Blurton from Gláma•Kím | Arkitektar. Karol’s passion extends beyond leading construction, interior, and design projects in Iceland — he’s also a committed athlete, constantly running, cycling, swimming, and sometimes even flying (to Iceland!). His […]
Find out more about how we can use our expertise and resources to support your projects. We’re here to answer any questions you might have about our services. If you prefer to reach out to a representative in your area directly, go to the Contact page.