Project no.: YABIMO/Z/325
Kongsli steel bridge construction, Sweden
Yabimo’s work involved production of steel bridge elements and logistics.
- Bridge elements made of S355J2+N steel.
- The weight of steel approx. 27 000 kg.
- Anti-corrosion protection applied.
- Compliance with EXC3.
- Surface treatment.
(Photo source: reinertsen.se)