« back
Project no.: YABIMO/Z/325

Kongsli steel bridge construction, Sweden

 

Yabimo’s work involved production of steel bridge elements and logistics. 

 

  • Bridge elements made of S355J2+N steel.
  • The weight of steel approx. 27 000 kg.
  • Anti-corrosion protection applied.
  • Compliance with EXC3.
  • Surface treatment.

 

 

 

(Photo source: reinertsen.se)