« back
Project no.: YABIMO/Z/002

A 127 000 kg-steel hall

The project assumed workshop technical documentation preparation and project logistics management. Among Yabimo’s responsibilities was also a steel construction prefabrication. s355 steel was used. The total tonnage of the construction amounted to 127 000 kg.