Workshop drawings and prefabrication of a steel cylinder

2020

Time frame

From time to time Yabimo takes a challenge and makes special type constructions. This was one of this kind of projects. Based on received documentation we prepared workshop drawings and performed prefabrication of a steel cylinder. The weight was less than 10 tons. We used standard S355 steel. The production time takes 4 weeks from the date of approval of final workshop documentation and signing of the contract. The project was delivered in September 2020.