Back

Vinsnes bru konstruksjon

2015

Time frame
Vinsnes bru konstruksjon

 Yabimo executed another innovative construction of the bridge in Vinsnes. The contract covered the production of bridge elements, beams, bearings and plates.

The contract covers the production of bridge elements, beams, bearings and plates.

  • The total weight of steel: 55640 kg
  • Steel grades: S355N (54715kg); Weldox 700E / 690QL (925kg)
  • Corrosion protection depending on the item: hot dip galvanising, powder coating, painting International
  • Class inspection (depending on the item): 1 or 2
  • Material certificates (depending on the item): 3.1 or 3.2
  • Execution class : EXC3.
     

 

Would you like to learn more about this and other projects?

Would you like to learn more about this and other projects?

Other Energy projects

La oss snakke!

Finn ut mer om hvordan vi kan bruke vår ekspertise og ressurser for å støtte prosjektene dine. Vi er her for å svare på eventuelle spørsmål du måtte ha om tjenestene våre. Hvis du foretrekker å ta kontakt direkte med en representant i ditt område, gå til Kontaktsiden.