Project: YABIMO/2013/Z/062
Yabimo was awarded a new contract at realization of the infrastructure reconstruction of E6 National Road in Norway (Fellesprosjektet E6-Dovrebanen). The project assumption is to construct a wooden-steel bridge over railway tracks near Lillehammer.
Yabimo is responsible for production of the technical workshop documentation, steel prefabrication and project logistics. Bridge elements will be produced of steel: S355J2, S355N and some of acid-resistant steel.
Prefabrication will require pillars, plate beams, T-bars, joints to be produced. The whole construction will be connected with laminated wood. Anticorrosion treatment will be: dip hot galvanising, and power coating. The project is a challenge due to a large amount of details and quality prefabrication requirements.
On June 3rd, we visited the Pediatric Department of the Stefan Żeromski Specialist Hospital to bring joy to the little patients. To celebrate Children’s Day, all the children received sweet presents, bringing smiles to their faces. But that’s not all. We funded creative activities using art – art therapy. The campaign will continue throughout June […]
The Rema 1000 Handballfestivalen 2025 will already start at the weekend. The SKS Kusy team from Krakow will take part in the tournament. We are proud to support such talented and gifted players! We invite you to cheer them on. Supporting sports initiatives is a long-standing part of Yabimo’s mission. For us, it’s not just […]
Find out more about how we can use our expertise and resources to support your projects. We’re here to answer any questions you might have about our services. If you prefer to reach out to a representative in your area directly, go to the Contact page.